ALB#1: Turning Disk

Methods

Number of products

Ztotal (MWh)

Ztotal/product

(kWh)

PDTE

(%)

Zmain

(MWh)

Zmain/product

(kWh)

Zsupport

(MWh)

Zsupport/product

(kWh)

PDSE

(%)

Factory

866.54

92.54

106.79

-

53.43

61.66

39.11

45.14

-

GA

1,078.52

105.61

97.92

8.31

66.50

61.66

39.11

36.26

19.65

TS

1,093.80

106.55

97.41

8.78

67.44

61.66

39.11

35.76

20.78

CS

1,105.99

107.30

97.02

9.15

68.19

61.66

39.11

35.36

21.65

ACS

1,169.18

111.20

95.11

10.94

72.09

61.66

39.11

33.45

25.88

ALB#2: Dragging Arm

Methods

Number of products

Ztotal

(MWh)

Ztotal/product

(kWh)

PDTE

(%)

Zmain

(MWh)

Zmain/product

(kWh)

Zsupport

(MWh)

Zsupport/product

(kWh)

PDSE

(%)

Factory

1,073.00

83.00

77.36

-

43.90

40.91

39.11

36.45

-

GA

1,824.46

113.75

62.35

19.41

74.64

40.91

39.11

21.44

41.19

TS

2,000.30

120.95

60.46

21.84

81.83

40.91

39.11

19.55

46.36

CS

2,051.92

123.06

59.97

22.49

83.95

40.91

39.11

19.06

47.71

ACS

2,096.90

124.90

59.56

23.01

85.79

40.91

39.11

18.65

48.83

ALB#3: Frame

Methods

Number of products

Ztotal

(MWh)

Ztotal/product

(kWh)

PDTE

(%)

Zmain

(MWh)

Zmain/product

(kWh)

Zsupport

(MWh)

Zsupport/product

(kWh)

PDSE

(%)

Factory

202.47

77.55

382.99

-

38.43

189.83

39.11

193.17

-

GA

368.25

109.02

296.03

22.71

69.90

189.83

39.11

106.21

45.02

TS

368.25

109.02

296.03

22.71

69.90

189.83

39.11

106.21

45.02

CS

372.33

109.79

294.87

23.01

70.68

189.83

39.11

105.04

45.62

ACS

388.37

112.83

290.53

24.14

73.72

189.83

39.11

100.71

47.87